Tora Cement Factory Lifting 4 Chimneys

Rent Cranes
Demag PC/CC4200


Lifting Condenser.
Location: Torah Cement Factory.
Crane: Demag PC/CC4200 .
Load weight: 170 ton, Boom length: 56M.
Radius: 30M, Supper lift: 200 ton.

 

Lifting 4 Chimneys.

Cranes to Torah Cement Factory.

Location: Tora Cement Factory.

Crane: Demag PC/CC4200, Chimney weight: 170 ton.

Boom length: 70M, Radius: 24M, Supper lift: 100 ton, Lifting height: 30M .

 

tora-cement-factory. is one of the leading companies in the field. of cement production High quality.
Tora-Cement-Factory Lifting 4 Chimneys & Lifting Condensers.It is constantly updating the factory with modernized equipment
Always on top in this field.The weights that the company replaces are large and at high altitudes.As the work is often done without interruption
of production lines.That is why the company uses our company's cranes in this business. This is because our company provides the capabilities
and equipment. needed to operate.because our company provides. the capabilities and equipment. needed to operate.
Also, our company’s commitment to punctuality in providing equipment.And also to complete the required works. at the required time.
It is estimated in advance. for non-interrupted production.We are happy with this great confidence. in our company.
We always pay great attention. to the requests and work of the customer.and even place the requests. of the customer Of utmost importance.
For every problem, we find a solution.Also we see that nothing is impossible. In our work.there must be a solution to every problem.
On this basis, and on this belief, we deal with all clients and all businesses.Tora Portland Cement Company.TPCC, the first cement company in Egypt,
was established in 1927. In addition to licensing the oldest clay quarry in Egypt, TPCC was also the first to use the dry cement production.
method and modernize its lines using wet kilns to reduce side dust. In June 2006, Tora Cement received the API Quality Certificate
for oil well cement production. In cooperation with other local and foreign cement companies, Toura Cement has invested its long and rich
experience in establishing .advanced centers for administrative and technical training. on an area of ​​10,000 square meters. The programs
are specifically designed to meet the needs of the cement industry. In addition, the centers have become an international meeting point
for those in the industry. Tora plant.Cement Company was established in 1927 and began production in 1929. It consists of 9 production
lines, including two in operation, located on an area of ​​10,000,000 square meters in Tora district (South Cairo area).Types of cement
produced in Tora Factory:
CEM I 42.5 R (in accordance with EN 197.1 / 2011 and ES 4756-1 / 2013).
Techno CEM II / A-S 32.5 R (in accordance with EN 197.1 / 2011 and ES 4756-1 / 2013).
end page cranes for rental
web counter web counter