Power Station EL Korymat

Crawler Crane Demag CC2400

 

Crane: Demag CC2400

 

Site: El Korymat Power Station, Load Weight: 180 ton, Boom Length: 54m, Radius: 17m

 

 

Crane: Demag CC4200

 

Site: El Korymat

 

Load Weight: 140 ton, Boom Length: 54m, Radius: 17m

 

Power Station EL Korymat
One of the largest power generation and production plants in the city of Karimat, Giza Governorate, Egypt
The station was completely renovated with telescopic booms and lattes boom
Description of the plant
The power project in Quraymat 3 includes a power block consisting of two 250 MW combustion turbines. Each one feeds the exhaust gases to its own heat recovery steam generator (HRSG). The steam is fed from two heat recovery steam generators one 250 MW (nominal) generator, re-heated and condensed.
The estimated net output of 750 MW is achieved by burning natural gas in CTGs without releasing the additional heat recovery steam generator. NOx emissions are controlled by dry low nitrogen oxide (DLN) combustion devices. An inlet air filtration system supplies filtered combustion air to the CTGs. The spent steam from the steam turbine is fed into a separate and split water box condenser with one and one passage.

 

Crane: Demag CC2400

Site: El Korymat Power Station

Load Weight: 120 ton, Boom Length: 54m, Radius: 17m

We are happy to do such work and our success in finding appropriate solutions.

For this and other similar work.

It was not easy to find the right port to lift these power transformers.

Geographically match the power plant, the loads to be lifted, and the transport using trailers Hydraulic

We always hope to obtain the satisfaction of our customers

Power is generated at factory standard voltage in CTGs and STGs, and is stepped up through the main transformers and fed to the utility grid via 220 kV extension, gas insulated switchgear (GIS). The Nile River provides cooling water for the station.

The project's contracting plan used a multi-package system. Five (5) contractual packages and purchase orders have purchased equipment and services.

Project details

Owner of the Upper Egypt Electricity Production Company

The site is Upper Egypt

Date of the award September 2005

The contractual period is 49 months

Scope - all conceptual and detailed designs of factory systems

Preparing all tenders and documents that include the commercial and legal terms and following the instructions of the financing institutions and purchases of the owner

Project management, construction management, start-up and commissioning management, which included initial operating support