Crane: Demag CC2400
Site: El Korymat Power Station, Load Weight: 180 ton, Boom Length: 54m, Radius: 17m
Crane: Demag CC4200
Site: El Korymat
Load Weight: 140 ton, Boom Length: 54m, Radius: 17m
Crane: Demag CC2400
Site: El Korymat Power Station
Load Weight: 120 ton, Boom Length: 54m, Radius: 17m
We are happy to do such work and our success in finding appropriate solutions.
For this and other similar work.
It was not easy to find the right port to lift these power transformers.
Geographically match the power plant, the loads to be lifted, and the transport using trailers Hydraulic
We always hope to obtain the satisfaction of our customers
Power is generated at factory standard voltage in CTGs and STGs, and is stepped up through the main transformers and fed to the utility grid via 220 kV extension, gas insulated switchgear (GIS). The Nile River provides cooling water for the station.
The project's contracting plan used a multi-package system. Five (5) contractual packages and purchase orders have purchased equipment and services.
Project details
Owner of the Upper Egypt Electricity Production Company
The site is Upper Egypt
Date of the award September 2005
The contractual period is 49 months
Scope - all conceptual and detailed designs of factory systems
Preparing all tenders and documents that include the commercial and legal terms and following the instructions of the financing institutions and purchases of the owner
Project management, construction management, start-up and commissioning management, which included initial operating support