Road El-Farag Bridge Cairo - Giza

Crawler Cranes

Road El-Farag Bridge

Rod al-Faraj and this bridge linking Cairo and Giza

Because our company has great potential as well as long experiences and good reputation
Our company has been selected to carry out the important work in the construction of the new bridge which is now completed
This bridge has been completed in Cairo in the neighborhood of Rod al-Faraj and this bridge linking Cairo and Giza
Our company also provided several different load cranes as well as a 400 ton crawler crane
300 Ton Crawler Crane - Each crane is placed on a water barge as pictured
Crawler Crane on barge
Crawler Crane  in Road El-Farag Bridge cairo egypt
Crawler Crane  in Road El-Farag Bridge
Crawler CraneCC 2400 on barge
It is one of the major newly built bridges.
It is a relatively long bridge several kilometers long. It is linked to a major road
Road construction had a major impact in solving traffic congestion in this important area.
This resulted in saving time for many workers, and large numbers benefited from it. We provided the large cranes the bridge needed. And also some other equipment.
The work in the bridge with cranes was done only at night and during the day, and work was done despite that handicap on time and with great success.
The hub includes 6 niches and niches in parachutes; And 8 entrances and outlets to connect with the Ring Road and West Nile Bridge, 400 meters long, 50 meters wide, 14 meters high, and a navigation hatch width of 120 meters, allowing the passage of floating hotels, and it was built with a mobile vehicle system. It is recorded in the Guinness Book of Records as the largest suspension bridge in the world. In terms of width of 67.3 m in the middle and the largest navigational opening across the Nile, the width of the opening of the navigator reaches 300 m, its columns are 100 m and the carrying capacity is 120 tons.
Statistical data on the works carried out by the authority:
• Total length, including crossings, entrances and ports, is 12 km.
• The total amount of concrete million m.
• The total amount of iron is 28 thousand tons.
• Total piles no. 6004 with a diameter ranging from 80 cm to 2 m.432 bases columns of 1908
• Total no. Horizontal beams over columns 432.
• Total pre-cast beam no. 2830.
• A high steel structure on the eastern side of the Nile, weighing 7000 tons. The cables remained 1,500 tons
• Steel bracing total no. 11 with a total length ranging from 32 to 62 m, and its weight is 15 thousand tons
for more here
https://www.arabcont.com/english/project-555