Cairo International Airport.
Lifting & installing buildings beams.
Location: Cairo Airport Terminal 3, Crane: Liebherr LTM1500 (500 ton)
Load weight: 42ton, Boom length: 18M, Radius: 18M, Flyjib: 35M, Lifting height: 15M
Lifting & installing building beams.
Location: Cairo Airport Terminal 3.
Crane: Liebherr LR1280 (280 ton), Load weight: 10ton to 29 ton
Boom length: 53M, Flyjib: 37.4M, Radius: 50M, Lifting height: 30M
The major renovations, updates and expansions at Cairo International Airport.
It was a very big and wonderful job. as the size of the airport was doubled to the original size.
This led to an increase in the carrying capacity. of air traffic, and thus the volume of passengers and passengers.
This made Cairo International Airport one of the largest airports in the Middle East.
Our equipment of cranes and other equipment .also had a role in this major work.
This really made us happy and proud of this work.