Key information:
A- Dimensions of packages:Package Weight Length Width Height Gas turbines 372 tons 13.90 m 5.83 m 5.92 m Stator generator 293.80 tons 13.53 m 4.51 m 5.10 m
B- The transfer process took place in September 2008 from Alexandria Port to Al-Atf Power Station, with a length of 98.700 km.
C- Conveyor configuration: 1 × 3 × 16 conventional hydraulic trailer.
D- Bottle necks: The most difficult points in these maneuvers were:
We had to do very difficult maneuvers because the first part of the transfer was inside the city of Alexandria and the last part was inside the city of Mahmoudiya.Supporting 4 weak bridges with a special system based on transferring the load to the water lifting force.Power generation
Country Owner Key Features Year Completed Abu Qir - Egypt Abu Qir Thermal Power Station, WDEPC 2 × 650 MW
1- CP-106 Steam Turbine 2012 Nubaria - Egypt WDEPC Nubaria 3 combined cycle 1 x 750 MW 1- 1 * 250 MW Steam Turbine CP-106
2- Mechanical Packaging CP-118 2010 Creams - Egypt NUEEPC Creams 3 combined cycle 1 x 750 mW 2- HRSG CP-105 BOP blast blocker
2010 Flexibility - Egypt MDEPC Flexibility combined cycle 1 x 750 MW
1- CP-118 Mechanical Package 2- Electrical Package CP-117 2010 El-Tebeen, Egypt, El-Tebeen Thermal Power Plant 2 x 350 MW
1- CP-106 Steam Turbine
2- Mechanical Packaging CP-118
3- Electrical Package CP-117
2010 Flexibility - Egypt MDEPC Flexibility 2 x 250 MW CP 101 Combined Cycle 2009 Sidi Kerir - Egypt WDEPC Sidi Kerir 2 x 250 MW CP 101 combined cycle 2009 Al-Kuraimat - Egypt NUEEPC Al-Kuraimat 2 - combined cycle 1 * 750 MW 2008 Talkha - Egypt EDEPC New Talha-Combined Cycle 1 * 750 M.W 2008 North Cairo - Egypt CEPC North Cairo 2 - combined cycle 1 * 750 MW 2007
Nubaria - Egypt WDEPC Nubaria I, II - Combined Cycle 2 * 750 M.W 2006
North Cairo - Egypt CEPC Cairo North I - combined cycle 1 * 750 MW 2005
Oman, full international
Energy Company Al-Kamil Gas Turbine Power Plant (3 × 92) MW 2004 Alexandria - Egypt / Intergen Bechtel
Sidi Kerir power station 1, 2, 3, 4, 5 and 6 combined Course 2003 FOR MORE https://www.pgesco.com/